AN ISO 9001:2000 COMPANY |
|
 |
|
|
 |
| Back |
|
| |
Diwali Bonanza
(New Prize Scheme) |
Period – 01/11/2008 to 30/11/2008
|
|
|
| Criteria |
| For All New Joinings after 01/11/08 Completing the structure as mentioned. (2, 4) |
| All Joinings Prior to 01/11/08 has to introduce 5 Direct within the above mentioned Period. |
Following Product Code will be considered for the Prize Scheme
Product Code – 6001, 6002, 6003,6004,7001, 7002, 7003, 7004, 4007, 4006, |
| |
| |
|
|
|
|
|
|